Aerial view of the KINGSUN manufacturing campus

Flexible cooperation

Two Development Paths. One Connected Manufacturing Base.

KINGSUN has a strong development team focused on structural kits for LCD televisions. Cooperation can use the compatibility advantages of shared tooling or proceed through customer-specific development.

KINGSUN stamping production line
KINGSUN 1800-ton stamping press
KINGSUN automated production equipment
01

Shared Tooling Compatibility

For compatible television structures, established shared tooling can provide a practical starting point for technical evaluation and project discussion.

02

Custom Development

When structure, material or assembly requirements differ, KINGSUN can support a customer-specific development route from product design through tooling and production.

Project flow

Six connected stages from development to assembly.

  1. 01Product Development & Design equipment illustrations

    Product Development & Design

    Translate structural requirements into an engineering-ready product concept.

  2. 02Mold Manufacturing equipment illustrations

    Mold Manufacturing

    Develop the tooling required for the confirmed component structure.

  3. 03Injection Molding equipment illustrations

    Injection Molding

    Produce molded structural parts for the approved television program.

  4. 04Metal Stamping equipment illustrations

    Metal Stamping

    Form television metal components through the matched stamping route.

  5. 05Coating equipment illustrations

    Coating

    Apply the specified surface-finishing process to prepared components.

  6. 06Assembly equipment illustrations

    Assembly

    Bring the required parts together as a coordinated structural set.

Strict quality control

Quality control across the full production lifecycle.

Inspection extends from incoming materials through finished-product delivery to support stable, reliable, safe and compliant product quality.

01

Full-cycle Quality Control

Defined inspections cover the production lifecycle from raw-material receipt through finished-product delivery.

02

Batch Traceability

Each production batch receives a dedicated quality file recording key production-process and inspection data for product and issue traceability.

IQC

Incoming Quality Control

Incoming materials and components

PQC

Process Quality Control

Defined production and process points

FQC

Finished Quality Control

Completed product requirements

OQC

Outgoing Quality Control

Final release before delivery

KINGSUN dimensional inspection of a television back panel
On-site dimensional inspection

Inspection equipment

Dedicated equipment supports production verification.

Coordinate Measuring Machine

Coordinate Measuring Machine

Working size: 1500 × 1200 × 200

RoHS Analyzer

RoHS Analyzer

Material compliance screening equipment

Height Gauge

Height Gauge

Dimensional measurement support

Hardness Tester

Hardness Tester

Material hardness inspection support

Turn Your OEM/ODM Requirements Into a Production Plan.

Share your structure, tooling route, target volume and delivery requirements with the KINGSUN team.

Start Your OEM/ODM Project